01. OSU private lines start at access NEs A1 and A2 and end at data center NEs D1 or D2. Each access NE packs its OSUs into one ODU toward aggregation NE C. NE C switches only at the ODUk level; NEs D1 and D2 can switch at the OSU level. A1's ODU is routed through C to D1.
A planner cannot set up new OSU services from A1 to D2, although the A1–C ODU has spare capacity.
What explains this?
a) OSUs must end on the same pair of NEs as their carrying ODU, so they can never be regroomed between ODUs
b) NE C can switch A1's ODU only as a whole toward D1, so OSUs for D2 need another ODU or grooming at D1
c) OSUs cannot pass through an NE without OSU switching, so NE C must be upgraded before any OSU crosses it
d) The D2 services exceed the bandwidth of the A1–C ODU, which cannot lend its idle capacity to them
02. Packet-capable NEs A and C carry an E-LAN for several enterprise customers through an ODU2 pipe of 8 tributary slots that is ODU-switched at NE B. The customers' contracted CIRs now total 13 Gbit/s, and NE A's egress queues toward the pipe drop packets every busy hour. Free tributary slots of about 1.25 Gbit/s each: A–B 30, B–C 6.
Which two statements are correct? (Choose two.)
a) Replacing the pipe with an ODUflex of at least 11 slots would carry every contracted CIR
b) HQoS at NE A would honor every customer's CIR within the existing ODU2
c) A second ODU2 pipe cannot be added on this route, because B–C has fewer than 8 free slots
d) The ODU2 pipe takes free slots when its queues fill, so the drops must occur at NE B
e) WRED at NE A would let the pipe carry the full 13 Gbit/s during the peaks
03. Gold ODUk services G1 and G2 on electrical-layer ASON share one protection path under 1:N protection, with rerouting enabled. G1 has the higher protection priority. In normal operation the protection path carries a low-priority extra-traffic service X. A wrong cable record hid that the working paths of G1 and G2 share a duct, and one excavation cuts that duct. The protection path is undamaged, and spare capacity exists for rerouting.
What is the outcome?
a) G1 and G2 split the protection path between them, while X keeps running at a reduced rate
b) X keeps the protection path, and both G1 and G2 are restored by rerouting after several seconds
c) G2 takes the protection path because its failure was detected at the same moment, and ties go to G2
d) G1 takes the protection path at once and X is dropped, but G2 returns only after rerouting
04. A Diamond ODUk service on electrical-layer ASON has its working leg on OTU link A–B and its protection leg on OTU link A–C; no OTU link appears in both legs. Physically, both OTU links are wavelengths that leave A on span A–X and pass optically through ROADM node X, which has no electrical cross-connect for them. Node A also has a second fiber direction, toward node Y, from which C can be reached. One cut on span A–X takes down both legs at once.
Which statements about this design are correct? (Choose two.)
a) ODUk SNCP needs both legs on the same wavelength, so the selector could not switch to the protection leg
b) The legs are diverse at the electrical layer but share span A–X underneath, because both wavelengths pass through X optically
c) Electrical-layer rerouting had already moved the protection leg onto link A–B before the cut
d) Adding OLP on span A–X would fix the design, because OLP also protects against node X failing
e) Carrying the A–C wavelength out of A toward Y, avoiding span A–X, removes the shared risk without changing the ODU-layer routes
05. A regional NG WDM line was built for 10G wavelengths with direct-detection (on-off keyed) receivers, and every span has a DCM. The operator is now adding coherent 100G wavelengths on the same line, while 20 of the 10G wavelengths must stay in service for two more years.
An engineer proposes removing all DCMs now, because they add loss and the coherent receivers compensate chromatic dispersion in DSP.
What is the best assessment of the proposal?
a) Proceed now; the DSP in each coherent receiver also corrects the dispersion of the 10G wavelengths on the same fiber
b) Proceed now, but fit PMD compensators instead, since PMD and not dispersion limits the 10G wavelengths
c) Defer it; coherent wavelengths cannot be received over a compensated line, so they need a new fiber pair
d) Defer it; the 10G receivers depend on the DCMs, while the coherent channels still run over the compensated line
06. A link runs A – OLA – B, with an optical line amplifier site in the middle that has no FD test port. All wavelengths fail. The OLA's line input power and its output power are both normal, while B reports LOS on its line input. An FD test launched from site A toward the OLA shows a clean trace that ends at the OLA's distance, matching the baseline.
What should the engineer do to locate the fault?
a) Run FD from the B end of the link, back toward the amplifier site in the middle
b) Raise the pulse width at site A so that the trace passes through the OLA into the second span
c) Dispatch a crew to the first span, where the trace from site A ends
d) Replace the amplifier at the OLA
07. At site M, one line amplifier carries 40 wavelengths east: 32 arrive from site W and 8 are added locally. A fiber cut west of M removes the 32 through wavelengths. For a few hundred milliseconds afterwards, the 8 local wavelengths show a power spike and a burst of pre-FEC errors at the far end. They then settle and stay error-free. OD shows the span losses and OSNR on their path unchanged before and after the event.
Which two conclusions fit this evidence? (Choose two.)
a) The fiber on the local wavelengths' path degraded at the same moment as the cut
b) Losing 32 channels permanently lowered the OSNR of the 8 survivors
c) The far-end receivers of the 8 wavelengths are faulty and need replacing
d) The amplifier briefly gave its output to fewer channels before its gain control settled
e) The errors on the local wavelengths are a consequence of the cut rather than a second fault
08. A new NG WDM span between sites P and Q has about 38 dB of loss. To carry traffic across it, the design adds Raman amplification and a high-gain EDFA at Q, and the planned OSNR for the wavelengths has margin. Q and the sites beyond it are to be managed through the OSC from the P side.
During design review, which additional check is essential for this span?
a) That the wavelength plan leaves a free channel inside the EDFA band for the OSC to use
b) That the span's PMD is low enough for the OSC, which runs at a higher rate than the traffic wavelengths
c) That the OSC can cross 38 dB on its own budget, since line EDFAs do not amplify it
d) That the EDFA gain at Q also covers the OSC, since the OSC is added before the booster at P
09. A 5G operator delivers phase over its OTN network from one GNSS-locked grandmaster per region, using G.8275.1 full timing support with boundary clocks in every node. A risk review asks how to keep base station phase within budget if GNSS is jammed across a whole region for many hours.
Which two measures address this risk? (Choose two.)
a) Run SyncE traced to a non-GNSS PRC alongside PTP, so clocks hold accurate frequency during the outage
b) Add a second GNSS-locked grandmaster at another site in the same region
c) Replace the boundary clocks with transparent clocks so that fewer nodes regenerate time
d) Give each grandmaster a high-stability oscillator, such as a cesium reference, for long holdover
e) Enable SSM on the PTP ports so that slaves learn the grandmaster's reduced quality
10. Two SDH NEs, X and Y, are linked by an STM-16 that an OTN network carries as an ODU1 with asynchronous mapping. NE X lost its timing reference two days ago and has been in holdover since, drifting slowly. NE Y is locked to a PRC-traceable reference. Y now records continuous pointer justifications on traffic from X, and E1 customers on PRC-timed equipment behind Y report periodic slips. Y's synchronization status shows its external reference selected at QL-PRC, while the S1 byte in the STM-16 arriving from X reports QL-SEC. The OTN path shows no alarms or errors. The SDH team asks the OTN team to fix "their timing".
Which assessment is correct?
a) The OTN path retimes the STM-16 to its own clock, so an OTN clock fault causes the pointer justifications
b) The OTN carries X's clock transparently, so the offset is X's holdover drift, which only restoring its reference will cure
c) Pointer justifications reveal bit errors on the OTN path that the ODU1 PM fails to count
d) Y should take its timing from the STM-16 arriving from X instead of its own reference